(2) Construction electrical control box. There are two types of electrical control boxes used in actual construction. One is the total control box. The number of the control box must be strictly controlled. Too much will lead to loss of control, and the principal will increase. Too little will result in low voltage and low power. Will affect the life of the cable. According to the previous construction experience, each 8 conveyors have a total control, and each sub-control is set up, which is more reasonable. At the same time, the power supply of the main control box should be powered by different power sources.
(3) Configuration of construction power supply. During the construction process, the configuration of the power supply and cable is very important. It should be determined according to the specific conditions of the construction. If there is no special situation, it can be configured according to the daily experience: the cable is laid with a copper conductor three-phase four-wire with a diameter greater than or equal to 50mm2. The power supply, the main control box and the construction power supply are placed in one of the eight conveyors to ensure that the conveyor can work normally.
It is suitable for the computers.inspection appliance and instruments with rated voltage up to 300/500V. This product presents an excellent performance in high
frequency locations
Instrument Cable,Moving Rubber Cable,Cpe Sheath Flexible Cable,Outer Moving Cable
Baosheng Science&Technology Innovation Co.,Ltd , https://www.bscables.com